Water Alert Level 2 - PIopio
Due to operational issues and the current hot weather, Piopio township is in Level 2 water restriction.
Water conservation measures are required to reduce demand on the water treatment plant. We ask Piopio residents to be mindful of their water use.
Planned Water shutdown notice - Tuesday 17 February 2026
A day-long water shutdown will be happening on Tuesday 17 February from 8.30am to 4.30pm on Boddies Terrace, Wesley Terrace, Tawa Street, Matai Street, William Street and Anzac Street.  This is to allow council contractor Schick Civil to install a new watermain line. Thank you for your understanding.

Collaboration builds on great work at Maara Kai Roopu

1 Jun 2022, 12:37 PM

   

Great things happen when collaboration is at play.

Council recently teamed up with Michelle Wi of Maara Kai Roopu to improve the health and safety and amenity values at the community garden.

A wastewater pump station has been onsite for decades, and when the site became occupied by Maara Kai Roopu, it was apparent that the pump station needed to be fenced off to minimise the health and safety risk.

The subsequent work was a collaboration between Council’s Water Services and ISBU teams who worked constructively with Michelle to ensure everyone’s needs were met.