There following table lists the various roading projects currently underway on State Highways in the Waikato Region. 

 

 

Location Start date End date Closure type Description or work Works Contractor Traffic Contractor
State Highway 3. 19 September 31 October 2016 Speed restriction around slumping with a slight lane deviation.
Two areas of slumping on side of road. Broadspectrum Inframax Construction Limited
State Highway 3 Approx 1.5km South of the Mokau Bridge, Mokau 23 September  31 December 2016 Lane closure with Stop/Go in place.  Speed restriction around work site.
One lane closed due to large slip. Inframax Construction Limited Inframax Construction Limited
State Highway 3 Mokau 26 September 21 October 2016 Shoulder closure, unless additional room is required.  If so, a lane deviation with speed restriction around work site will be implemented. Installation of new water main. McIndoe Group Inframax Construction Limited
State Highway 3 Kihikihi 6 October   30 October 2016 Shoulder closure with a diversion of the footpath around work site. Removal of tree branch.    Waipa Networks
State Highway 31 - Puti Bluffs 18 October 18 October 2016  Stop/Stop for short periods of time (5 minutes max) to allow drone to film, then traffic will be allowed to continue.  Drone survey of rock face.    
State Highway 3 - Between Papakauri Rd (Mahoenui) and the Waikato/Taranaki boundary 18 October  18 October 2016  Inspection only Safety audit for NZTA's Safe Roads Alliance MWH OPUS
State Highway 4 - Mokau River Bridge 18 October  19 October 2016  Inspection work only Inspection work in/around Mokau River Bridge Beca Beca
State Highway 39 - Approx 300m South of Hanning Road. 18 October 19 October 2016  Lane Closure with Stop/Go in place.  Speed restriction around work site. Construction of commercial driveway   Traffic Management NZ
State Highway 3 - Between Racecourse Rd and Mutu St, Te Awamutu 18 October 19 October 2016  Lane deviation during works at day, Shoulder closure at night. Installation of two driveways   Traffic Management NZ
SH3 - Between Te Awamutu and Te Kawa Rd 18 October 18 October 2016 Either contraflow or Stop/Go (depending on situation) New line marking Spray Marks Ltd Spray Marks Ltd
SH3 - Between Kiokio Station Rd and Mangaorongo Rd 18 October 18 October 2016
Either contraflow or Stop/Go (depending on the situation) New line marking Spray Marks Ltd Spray Marks Ltd
SH31 - Approx 1.8km East of Te Kauri Lodge 18 October 30 November 2016 Speed restriction put in place for safety reasons Slumping in road Broadspectrum Broadspectrum
SH3 - Between Hunts Rd (Piopio) and Totoro Rd 18 October 18 October 2016   General signs maintenance Inframax Construction Limited Inframax Construction Limited
SH3 - Carroll St, Te Kuiti 18 October 18 October 2016 Lane closure with Stop/Go.  Speed restriction around work site in place. Stabalising several patches within the area described. Inframax Construction Limited Inframax Construction Limited