Public notification: Military funeral on Sunday in Te Kūiti.

A forward notice that there will be firing of blank cartridges which produce loud bangs in support of a military funeral sometime between the hours of 1.30pm to 3pm on Sunday in Te Kūiti.

There will be soldiers marching around the town in support of the funeral ceremonial event with weapons, so please do not be alarmed or concerned.

There will also be a road closure at the intersections near the Les Munro Centre in both directions on Sunday 15 March. The closure will be in place at 12.30pm to 1pm. 

Soldier presence in Te Kūiti will be prominent from Saturday afternoon and will increase up to 100+ on the Sunday for the funeral.

Thank you for your understanding.

Mokau Water Supply - mains replacement project

27 Sep 2016, 9:21 AM

Waitomo District Council have commenced work to replace part of the piped water infrastructure in Mokau.

The first phase of a staged replacement pipe programme has been completed. WDC has installed additional shut-off service valves on the Mokau water main that runs underground adjacent to State Highway 3 in the township, to isolate smaller sections of the reticulation. This work forms part of the mains replacement project that is scheduled for this coming summer.

As a result of the recent failure of the water supply mains, the timing of the replacement works has been brought forward. WDC will commence phase two of the project shortly and install a new water main along SH3 from the water main pump station to Rerenga Street.

There will be short periods of disruption to the availability of the water supply as we connect up the new works to the existing reticulation network. We understand that this might be inconvenient, and we ask Mokau residents to bear with us during this time. Residents will be notified in advance of the scheduled work.

Any concerns or complaints about the Mokau water supply can be made by phoning 0800 932 4357. WDC’s after-hours call centre operates 24 hours a day, seven days a week.